With its 360-gallon capacity, you can crush up to 180 acres at a time before needing to top off with additional water.
-Low Profile skid for Drone Spray Equipment
-Larger drone lockable box to accommodate the largest drones currently on the market
-Swivel arm shelf to allow take of drone from the shelf
-275 gallon water tank
-85 gallon chemical mixing tank “The Drone Cone” with jug rinsing, tank cleaning and agitation with a ¾ HP pump
-1 retractable hose reel with 50' of 1" hose for drone fill.
-1 retractable hose reel with 50' of 1" hose for fresh water.
-Custom 4'x4' Removable Platform with foldable post and chain linked railing (Raw Steel)
-1 Pipeliners umbrella
Generator options:
We can set you up with a Generac 18,000 watt for roughly $5,500.
The Drone Skid Pro gives you a ton of flexibility in how you operate. We require a 50% deposit up front to get production started. At this time, we are building to order so lead time is going to be about 8 to 12 weeks. That time frame will be minimized as we increase efficiency of production.
With its 360-gallon capacity, you can crush up to 180 acres at a time before needing to top off with additional water.
-Low Profile skid for Drone Spray Equipment
-Larger drone lockable box to accommodate the largest drones currently on the market
-Swivel arm shelf to allow take of drone from the shelf
-275 gallon water tank
-85 gallon chemical mixing tank “The Drone Cone” with jug rinsing, tank cleaning and agitation with a ¾ HP pump
-1 retractable hose reel with 50' of 1" hose for drone fill.
-1 retractable hose reel with 50' of 1" hose for fresh water.
-Custom 4'x4' Removable Platform with foldable post and chain linked railing (Raw Steel)
-1 Pipeliners umbrella
Generator options:
We can set you up with a Generac 18,000 watt for roughly $5,500.
The Drone Skid Pro gives you a ton of flexibility in how you operate. We require a 50% deposit up front to get production started. At this time, we are building to order so lead time is going to be about 8 to 12 weeks. That time frame will be minimized as we increase efficiency of production.